Description
The building is executed in all its structural part, in a good state of conservation, without arrows or signs of any anomaly, and the work of laying exterior masonry, interior masonry, granite laying on interior facades and outside. Waste water drainage pipes and electrical and communications networks are also carried out. The land has 1532sqm, with an area of approximately 1030sqm and a patio of 502sqm. The total gross construction area is approximately 4460sqm. The Hotel consists of 56 suites, 1 Restaurant / Bar, Conference room, gym and the possibility of a Roof-Bar (top of the hotel). Contact for any further clarification.